Solar EPC & Battery Storage Services

Start with your energy requirements. Build the project scope around them.

Illustrative stock photograph relating to solar energy work

What Does Your Site Need?

Lower daytime grid consumption, backup for essential equipment and better use of existing solar generation are different requirements. Each calls for its own assessment.

SESCO’s services focus on industrial solar EPC in Pakistan and battery energy storage systems (BESS). Commercial and residential solar applications sit within our EPC offering.

Share your site details, electricity usage and project priorities to begin.

Discuss Your Energy Requirements

Illustrative stock photograph relating to solar energy work

Battery Energy Storage Systems

Plan Storage Around the Loads That Matter

A battery proposal starts with what you need to power, for how long and under which operating conditions.

For BESS in Pakistan, project assessment considers your load profile, existing electrical infrastructure and intended application. This may include backup requirements, peak-load management or storing solar energy for later use, subject to technical suitability.

For sites with an existing solar installation, compatibility must be assessed before recommending an integration approach.

Information to Share

Site location and operating hours.

Critical equipment and its power requirements.

Required backup duration.

Existing solar, inverter and battery details.

Load-profile or demand data, where available.

Explore BESS Discuss a Storage Requirement

Solar Engineering, Procurement & Construction

From Site Assessment to Commissioning

Our solar EPC services connect system design, equipment procurement and installation within an agreed project scope.

We assess electricity use, available installation space and site conditions before preparing the proposal. Equipment specifications, responsibilities, exclusions and commercial terms are set out for review before work begins.

Industrial Solar

Plan generation around production schedules and facility demand. Our industrial solar solutions in Pakistan prioritise the relationship between energy use, operating hours and the proposed system.

Commercial Solar

For offices, schools, hospitals and other business premises, commercial solar installation begins with understanding daily consumption and essential loads.

Residential Solar

Household usage, roof space and backup requirements guide the choice of system. On-grid, hybrid and off-grid configurations are considered where suitable.

Existing-System Upgrades

A solar system upgrade may involve changes to capacity, equipment or storage. Recommendations depend on the condition and compatibility of the current installation.

EPC Project Stages

Assessment and site survey, where required.

System design and engineering.

Equipment procurement.

Installation.

Testing and commissioning.

Handover and operating guidance.

Explore EPC Request a Site Survey

Illustrative stock photograph relating to solar energy work

Trading – Coming Soon

Our Trading service is being developed. Product categories, availability and enquiry details will be published when the service launches.

Send a Product Enquiry

A Proposal Should Explain What Is Included

Equipment & Design

Review the proposed capacity, equipment models and design assumptions against your requirements.

Installation Scope

Know which electrical, structural and installation works are included, along with any exclusions or site-readiness requirements.

Commercial Terms

Review pricing, payment milestones and the proposed schedule. Delivery depends on project scope, equipment availability and site conditions.

Warranties & Support

Manufacturer warranties vary by product and model. SESCO’s workmanship coverage and service commitments should be listed separately.

Before You Request a Proposal

Should I enquire about EPC or BESS?

Choose EPC if you are planning a solar installation or reviewing an existing system. Choose BESS if your main requirement concerns battery storage. If both apply, send one enquiry explaining your generation and storage needs.

Can SESCO assess an existing installation?

Share its capacity, equipment models and the issue you want to address. The assessment will establish whether an upgrade or integration is technically suitable.

Are standard packages available?

Project recommendations are based on the site and its requirements.

How are project costs determined?

Costs depend on system capacity, equipment, installation conditions and the agreed responsibilities. A project-specific quotation follows the assessment.

What should I send with my enquiry?

Include recent electricity bills, your location, operating hours and major loads. For storage, add the equipment you need to support and the required backup duration.

Tell Us What You Need to Power

Planning a new installation, assessing battery storage or upgrading an existing system? Send your requirements and start with a project discussion.

Request a Site Survey